Hyosung is equipped with the technical capacity to design and construct substations that are 100% compatible with the global customer’s needs, which are offered in competitive prices and with first-class services.

Downloads
Catalog
Certifications
Search
  • /upload/product/image/1277239534942.jpg
  • /upload/product/image/1277239504681.jpg
  • /upload/product/image/1277239563874.jpg

Turnkey Services

  • Engineering
  • Procurement
  • Construction
  • Project Management
  • Operation and Maintenance
  • Installation Management
  • Technical Coordination/Assistance

Operation/Maintenance

  • Operation & Maintenance Manual
  • As-built Documentation
  • Site Training (Operation & Maintenance)
  • Services upon Customer’s Requests
  • Periodical Maintenance
  • Fast Maintenance Service
  • Overhaul

Engineering

  • System Engineering
  • Total Design of Substation
  • Substation Analysis
  • Power System Analysis

R & D

  • Continuous Focus on R&D
  • R&D Centers in Changwon & Seoul
  • Core Technology Research

Construction/Installation

  • Construction Management
  • On-Schedule Site Management
  • Installation/Commissioning up to 800kV Products
  • State-of-the-Art Testing & Diagnostic Facility

Consultant

  • Accumulated Technical Know-how
  • Optimal Solution (Design, Production,
    Installation, and Maintenance)

Project Management Capability

Sitemap Legal Notice Privacy Policy
COPYRIGHT © 2006 HYOSUNG. ALL RIGHTS RESERVED.
family site

Major Reference

layerClose

Qatar Substation Project

  • Client : Kahramaa
  • Site Location : Qatar
  • Product : Turnkey
  • Specification : three 132kV substations, two 66kV substations
  • Delivery : 2011 (ongoing)
Hyosung was awarded an EPC (engineering, procurement & construction) project, which includes a total of five substations (three 132kV substations, two 66kV substations, etc.) all connected as part of the nine-stage power grid expansion project in Qatar. Using the high value-added EPC method, which requires Hyosung to carry out and implement projects ranging from design to procurement to construction, the company will need to demonstrate its outstanding project implementation abilities across all areas. The substations to be built by our company are scheduled for completion by 2012.