Turnkey Solution

Hyosung is equipped with the technical capacity to design and construct substations that are 100% compatible with the global customer’s needs, which are offered in competitive prices and with first-class services.

Downloads
Catalog
Certifications
Search
  • /upload/product/image/1277239534942.jpg
  • /upload/product/image/1277239504681.jpg
  • /upload/product/image/1277239563874.jpg

Engineering

Based on our expertise in systems engineering and total substation design, we have outstanding capabilities in substation and power systems analysis. With engineering tools such as E-TAP and EMTP, our engineers have the expertise to perform reliable engineering calculations, a wide variety of power systems analysis, detailed schedule management, and more.

Procurement

We manufacture a full spectrum of heavy electrical equipment such as gas circuit breakers, gas insulated switchgears, power transformers, electrical panels, and products for system solutions, and have established global sourcing competencies and networks. With our in-house manufacturing knowledge and worldwide outsourcing network, we are able to supply transmission and distribution solutions at the lowest possible prices.

Construction

We participate in areas that require sophisticated technology that poses minimal impact on natural environment, and large-scale civil works that require a comprehensive engineering system such as power plants and industrial systems (e.g., power stations, substations, and environmentally-friendly plants), and harbor constructions.
Sitemap Legal Notice Privacy Policy
COPYRIGHT © 2006 HYOSUNG. ALL RIGHTS RESERVED.
family site

Major Reference

layerClose

Qatar Substation Project

  • Client : Kahramaa
  • Site Location : Qatar
  • Product : Turnkey
  • Specification : three 132kV substations, two 66kV substations
  • Delivery : 2011 (ongoing)
Hyosung was awarded an EPC (engineering, procurement & construction) project, which includes a total of five substations (three 132kV substations, two 66kV substations, etc.) all connected as part of the nine-stage power grid expansion project in Qatar. Using the high value-added EPC method, which requires Hyosung to carry out and implement projects ranging from design to procurement to construction, the company will need to demonstrate its outstanding project implementation abilities across all areas. The substations to be built by our company are scheduled for completion by 2012.